I needed to mock up a bracket for the new dual master cylinder. This will get welded to the frame and be located under the floor of the car.

New master cylinder bracket welded into place.

Steering rack & gear box removed from frame. This will be sandblasted and the gear box will be replaced with a power steering gear box.
Front end all cleaned up. Chevy straight 6 motor mounts ground off. Finally decided on replacing the 6 cylinder with a Chevy 350 & auto transmission.
No comments:
Post a Comment